Santa Monica Lot 4S Beach Path Access Improvements

Working with the City of Santa Monica to improve bicycle and pedestrian access to the Beach Path from Hollister Avenue, six concept designs were developed to analyze benefits to proposed circulation alternatives. The preferred design re-configures under-used parking lot space into a colorful promenade entrance to the Beach Path.

Visualization graphics were developed from concpetual plans and design documents, and fabrication designs were developed for plaza striping